Description
This mounting option is recommended for situations when you need a lab support lattice to cover the entire back panel of your fume hood. The horizontal rods of this Lab-Frame should measure 1/4” less than the interior width of your hood.
Assembly Instructions:
Lattice frame: Use the open connectors and lattice rods to assemble the frame. The kit assumes a lattice spacing of 1-foot; however, this may vary depending on your application. Rods may be cut for fit as necessary.
Mounting: Attach vertical base plates to the horizontal and vertical rod ends. Base plates may be secured with #10 screws. Mounting Screws Not Included.
NOTE: Follow your fume hood manufacturers’ requirements for attachment.
4 foot Kit Includes:
(3) 1/2″ X 36″ Aluminum Rods
(2) 1/2″ X 38″ Aluminum Rods
(6) L2A-1 Connectors
(7) L8A-1 Vertical Base Plates
(1) Assembly Instructions
6 foot Kit Includes:
(5) 1/2″ X 36″ Aluminum Rods
(2) 1/2″ X 62″ Aluminum Rods
(10) L2A-1 Connectors
(9) L8A-1 Vertical Base Plates
(1) Assembly Instructions
8 foot Kit Includes:
(7) 1/2″ X 36″ Aluminum Rods
(2) 1/2″ X 86″ Aluminum Rods
(14) L2A-1 Connectors
(11) L8A-1 Vertical Base Plates
(1) Assembly Instructions
Reviews
There are no reviews yet.